Floor sawing shower rooms to install drainage in Nottinghamshire
The refurbishment of the Staythrope Power Station office in Newark, Nottinghamshire, involved the installation of Aco drainage systems for two shower rooms. Core-ect utilized an electric three-phase push-along floor saw, necessitating the use of our three-phase generator. It was imperative to maintain minimal dust and noise levels during the project. After the concrete sections were cut, they were manually lifted using fixed anchors and eye bolts, subsequently raised with a small gantry. The floor sawing process required two days to complete.