Concrete Floor Sawing in Northampton
Core ECT were commissioned by Cox Design Consult and Construction to break up and remove 50sq m of existing rough and uneven concrete floor as part of the renovation of Caswell Science Park in Towcester Northampton. The work had to be carried out of hours with minimum vibration and noise. The process involved cutting the floor into 1 m square sections with an 3 phase electric diamond floor saw and lifting out with a mini digger in order to keep the noise and vibration to a minimum.