Concrete removal of temporary road crossing in Leicester
Concrete removal of temporary road crossing in Leicester
Diamond Floor Sawing
Diamond Floor Sawing
Removal of 500m concrete heavy reinforced temporary road crossing
Removal of 500m concrete heavy reinforced temporary road crossing

Concrete removal of temporary road crossing in Leicester

Removal of 500m concrete heavy reinforced temporary road crossing in a nature reserve with live services road 4 inches below the road. The process required precision Diamond Floor Sawing and Stitch & Core Drilling to separate blocks so they can lifted out by JCB digger.

LOCATIONLeicester
CLIENTAR Demolition
ENGINEERCore-ect Diamond Drilling
SCOPERemoval of 500m concrete heavy reinforced road
COMPLETED2023
PROCESSESDiamond Floor Sawing & Stitch Core Drilling